AZ BathMasters

Installation & Bathroom Remodel process

Give us a call:

(480)709-6442

Our Process in 3 Easy Steps

At Arizona BathMasters, we continue to care for your bathroom long after we have completed your installation. We offer workmanship, installation, and product warranty, as well as an approved cleaning products list and tips for keeping your bathroom looking like new for years to come.

|

STEP 1

Schedule Your free In-Home Consultation

During your in-home consultation, our design representative will listen carefully to your needs and ideas, then view and measure the space and share ideas for transforming your shower or tub area into a beautiful new bathroom. After picking out product color and design, or representative will provide you with a no-obligation quote for your project.

STEP 2

Order Your Product

During your in-home consultation, our design representative will listen carefully to your needs and ideas, then view and measure the space and share ideas for transforming your shower or tub area into a beautiful new bathroom. After picking out product color and design, or representative will provide you with a no-obligation quote for your project.

STEP 3 Tyvarian

The Install (Removal & Installation)
Tyvarian

Customers Choosing Tyvarian Cast Stone Slabs (Average Install 2 to 3 Days)

Day 1: One of our professional installation crews will arrive at your property at a scheduled time and start the process by setting floor runners and start removing the old material and preparing the area for your new, beautiful shower or tub. If more is required at this time, we will execute in the same fashion. We replumb as required then prepare the walls and floor. Generally, we get the shower floor or tub set/installed the first day.

Day 2:  We start templating the walls and start the cast-stone-slab installation process. Everything we do is custom, even the cast-stone-slabs are cut right on property. Once the walls are installed, we finish with corner shelves, Hannex toppers, windowsills, etc. We then install your new pluming trim kit, shower arm and head, mixing valve trim and drain cover. Depending on time limitations, we may return the third day to finish.

Please Note: If you are having a side-by-side turned into a walk-in shower, the process will change, adding the framing of a pony-wall and any other accommodations required.

 

STEP 3 BCI

The Install (Removal & Installation)
BCI

Customers Choosing BCI High Polymer Composites (Average Install 1 to 2 Days)

Day 1: One of our professional installation crews will arrive at your property at a scheduled time and start the process by setting floor runners and start removing the old material and preparing the area for your new, beautiful shower or tub. If more is required at this time, we will execute in the same fashion. We replumb as required then prepare the walls and floor. Generally, we get the shower pan or tub set/installed the first day. We start templating the walls and start the polymer wall installation process. Everything we do is custom, even the Polymer walls are cut on property. Once the walls are installed, we finish with corner shelves, Hannex toppers, windowsills, etc. We then install your new pluming trim kit, shower arm and head, mixing valve trim and drain cover. Depending on time limitations, we may return a second day to finish.

Please Note: If you are having a side-by-side turned into a walk-in shower, the process will change, adding the framing of a pony-wall and any other accommodations required.

 

You May Also Like:

AZ Bathmasters is proud to have earned the 2020 Angie’s List award for Super Service.

When it comes to bathroom remodeling, the details make a world of a difference. 

Cleaning a bathroom can be one of the most annoying chores in a household, but if you fall behind, it can become something even worse.

Start your remodel today!

Remodeling your bathroom should not be a stressful process.

Arizona BathMasters makes it easy to receive an effortless, hassle-free bathroom remodel.

|